Assignments

 

Scheduled Due Dates

 

Teamology Survey (Cognitive Mode) - 8/20

 

Deliverable #1: Assessment - Due 8/21 (top)

 

Procure Logbook - Due 8/27(top)

 

Deliverable #2: Team Contract - Due 8/27 (top)

 

Deliverable #3: White Paper & Presentation - Due 9/10 & 9/15&17(top)

 

2019 Pre-proposals

Design Project Team No.

1. Closed Waste Fluid Management System

 

 

2. Powered Suction Irrigation

 

3. Open Abdominal Aortic Aneurysm (AAA) Model

 

4. Ultrasoundable Abdominal Model

 

 

5. Ultrasoundable Peripheral IV Access Model

Team 7

 

6. Extending the Emergency iTrainer Model

Team 1

 

7. Dental Abscess and Nerve Block Model

 

 

8. Simulation-based Education (specific project TBD)

 

 

9. Car Seat for Tiny Babies

Team 6

Team 5

10. Safety Trach

Team 2

Team 4

11. Spirometry Counter

Team 3

 

12. Accessible Clothing

 

 

13. Automated System for Nanoparticle Assembly and Drug Loading

 

 

14. Multi-port Catheter for Vascular Intervention

Team 8

 

15. Device for Testing of Toxic Residual Elements in Radiopharmaceutical Production

 

 

16. Infectious Diseases and Infection Prevention (specific project TBD)

 

 

 

2019 Presentation Schedule (NEB 400)

Time Sep 17 Sep 19

11:10-11:28

(KM)2 (7)

SyrumSync (8)

11:29-11:47

BiomedVol (1)

TBA (2)

11:48-12:06

High Quality Engineers (4)

12:07-12:25

Brainy Bunch (5)

Biomimetic Solutions (6)

Other

SCaR MD (3) on Fri, Sep 20 at 11:10-11:30am in DO 409

 

Phase 1 Design Review - Due 9/17 (top)

 

Deliverable #4: Needs Assessment - Due 9/24 (top)

 

Deliverable #5: Functions and Requirements - Due 10/8 (top)

 

Deliverable #6: Project Plan - Due 10/22(top)

 

Deliverable #7: Project Schedule - Due 10/29 (top)

 

Deliverable #8: Competitive Landscape - Due 11/5 (top)

 

Deliverable #9: Early Risk Assessment - Due 11/12 (top)

 

Phase 2 Logbook Review - Due 11/19 (top)

 

Deliverable #10: Interim Design - Due 12/8 (top)

 

Phase 2 Design Review - Due 12/8 (top)

 

... (top)